Profile of terminal 1
-
Total area of terminal and piers
- Gross floor space: 360,000 m²
- Approach approx. 550 m long
-
Terminal
- Length: 220 m
- Width: 180 m
- Height: 32 m
- 33,000 m² of glass façades
- 160,000 m³ of concrete
- 30,000 tonnes of reinforcing steel
- 9,000 tonnes of construction steel for steel structures
-
Mainpier
- Length: 715 m
- 16 jetways
-
North pier
- Length: 350 m
- 12 walk-boarding stands
-
South pier
- Length: 350 m
- Nine jetways
-
Pavillons
- Right and left of the terminal (north pavilion, south pavilion)
- Space for additional security screening lines and check-in desks
- Length: 93.75 m
- Width: 37.50 m
- Height: 10.37 m
-
Terminal levels
- Level U2 – railway, machinery, supply and disposal area
- Level U1 – feeder level from the railway station to the terminal and Airport City
- Level E0 – arrivals, incl. baggage reclaim and access road
- Level E0Z – Intermediate level for separating passengers according to the Air Security Act
- Level E1 – access road, departures, check-in, security checkpoints, retail, cafes/restaurants and waiting rooms
- Level E2 – waiting rooms, lounges, offices
- Level E3 – lounges
- Level E4 – visitor terrace
-
All terminal and pier areas
- Ten check-in areas with a total of 118 desks
- 36 security screening lines and 5 more for transfer passangers
- Baggage reclaim hall with eight baggage reclaim carousels