Photo material of press releases 2020
High resolution photos for all current topics, events and press events can be downloaded here.
BER Terminal 2 ready for use
Terminal 2 is a departure and arrival terminal and has an annual capacity of 6 million passengers. It is connected to Terminal 1 via two bridges. Terminal 2 was completed in September 2020. Due to the collapse in passenger numbers T2 will probably not be put into operation until the 2021 summer flight schedule.
Download
Click on the following link to download the image.
For the source, please use:
© Günter Wicker / Flughafen Berlin Brandenburg GmbH